Late Summer Knitting

It’s the first day of September today and it won’t be long before the summer is over. The hedgerows are speckled red, orange and purple with elderberries, rosehips and blackberries.

It’s that in-between time, when on the whole it still feels like summer, but with dewy early-morning spiders’ webs and clumps of fungi letting us know that autumn is on its way.

It’ll soon be time to start knitting warm and cosy sweaters or perhaps even a blanket. But for now, I’m still knitting on my small summer projects. Another cardi for our grandson, this time with a diamond pattern, is well underway.

I’ve also started another pair of socks from the 52 Weeks of Socks book. This time it’s Lempi, designed by Rachel Coopey. My first attempt became far too wide, with a very loose and open fabric.

I never swatch for socks – do you? I just start and try them on, and if I’m not happy with what I’m getting I rip them out and start anew. That’s what I did with the first Lempi sock. I went down from the suggested 2.5 mm/US 1½ to 2.0 mm/US 0. Now the fabric and fit look right.

These socks have a knit-and-purl pattern on the feet, some colourwork on the legs, and long cuffs in p2, k2 alternating with narrow bands of k2, p2. A simple but very nice rib pattern. Just a few rows to go and I can start on the colourwork section.

The yarn I’m using is Lang Jawoll in three colours. It comes in 50 gram skeins instead of the usual 100 grams, which is handy for sock patterns using multiple colours. Each skein hides a small spool of thinner yarn inside for reinforcing heels and toes.

Both the Lempi socks and the little cardi need quite a bit of attention. The cardigan isn’t very difficult, but I’m making the pattern up as I go which makes it a little more complicated. So, in need of a mindless project alongside, I’ve also swatched for another Polka Dot Scarf. I gave the first one I knit away and may (or may not) keep this one myself. I’m using a different colour for the actual scarf – dark denim instead of grey.

With these three projects on my needles, I’ll have enough to do over the coming weeks. Meanwhile I’ll be composing a to-knit-list for when the days really start getting colder. Are you still knitting summery projects, too, or do you already have larger and warmer things on your lap?

It isn’t warm enough for our cherry tomatoes to ripen on the plants anymore, this late in the summer. So some of them are ripening on a glass plate in our window sill. They’re so pretty, and very tasty, too.

Hope to see you again next week. Byeeee! xxx